1. Skip to navigation
  2. Skip to content

Home arrow FAQs arrow FAQs on Construction

FAQs on Construction

How much steel was used for Singapore Flyer? Find your answers in FAQs on Construction.
  • How much steel was used for Singapore Flyer?
  • 1800 tons of steel was used to build Singapore flyer.
  • What is the timeline for the construction of Singapore Flyer?
  • Singapore Flyer was scheduled for completion by December 2007. Testing, commissioning, certification and training was carried out in January 2008.
  • Did the weather affect the construction process? If yes, how was it overcome?
  • Tropical rainstorms posed a problem during the steel erection process. However, lost time was regained by working late into the evening or night.
  • Are there any possibilities of future upgrades, such as, for example, an increase in rim size or a change of capsule design etc.?
  • The rim size will never change nor will the capsules. However, internal upgrades to the audio/video aspects, floor finishing or benches may be made in the future.

Maps & Brochures

mapsandbrochures-02.jpg